Hexion
Winter 2008
 
fracline
 
Prime Plus Case History

An East Texas operator fractured two similar offsetting Lower Cotton Valley wells; one with the partially cured Prime Plus 40/70 and one with a conventional, tempered resin coated 40/70 proppant. Initial production on the Prime Plus well was 143% higher and 90-day production was more than 300% higher.

Download the Prime Plus Case History (PDF)

 

 

 
 
© 2008 Hexion Specialty Chemicals   |   Privacy Policy   |   Email